Visit us on Google
Whatsapp Chat
Connect via Linktree
Connect via Linktree
Vatva, Naroda & Odhav Industrial Estates (GIDC) — Engineering Deployment Zone

Industrial Panel Air Conditioner Supply in Ahmedabad

Factory-direct supply, installation, and field commissioning engineered to endure peak local summer conditions of 45°C across Dyes, Intermediates & Specialty Chemical Formulations, Textile Processing, Dyeing & High-Speed Weaving Units, Heavy Heavy-Duty Plastic Injection & Extrusion Toolrooms.

Cluster Climate Envelope

Gujarat

Design Dry Bulb

45°C

Design Wet Bulb

27.5°C

Dust & Particulate Severity

High

Primary Target Industries

  • Dyes, Intermediates & Specialty Chemical Formulations
  • Textile Processing, Dyeing & High-Speed Weaving Units
  • Heavy Heavy-Duty Plastic Injection & Extrusion Toolrooms
Data calibrated against ISHRAE / ASHRAE regional summer meteorological tables.

Engineering Recommendation

Thermal Stress Analysis

Corrosive acidic chemical vapors combined with fine airborne dye pigment dust settle on open cooling fans, causing insulation breakdown and corrosion across VFD terminals.

Recommended Air Washer Architecture

Double-Skin Industrial Air Washer with SS 304 Base Sump and Multi-Stage Pre-Filters

Recommended Panel Enclosure Protection

IP55 / Anti-Corrosive Polyurethane or Epoxy-Coated Condenser Coils (R-134a)

Configured to prevent VFD drive tripping and condensation ingress.

Dispatch & Factory Spec

Series:ProCool CNC & VFD Series
Capacities:250 W to 7,500 W (1,500 to 25,600 BTU/hr)
Airflow:180 CFM to 1,450 CFM Closed Loop
Protection Standard:IP55 Enclosure Separation / CE Certified
Regional Supply Node:Aslali-Sarkhej Transport Nagar Logistics Corridor
Freight Lead Time:24-48 Hours Express Transit
MSME Registered OEM / Direct Tax Invoice & GeM Compatible

Deploy Industrial Panel Air Conditioner in Vatva, Naroda & Odhav Industrial Estates (GIDC)

Submit panel enclosure measurements, CFM static pressure targets, or single-line diagrams (SLD). Our engineering desk provides validated thermal heat load sizing and line-item BOQs within 3 hours.